Visada ieškome
Optimaliausių sprendimų
Contact us.
tel. (8~5)~213 38 17

Inžinerinių sprendimų gausa kaip vandenynas.

Gali įvertinti ir matyti, kur jis prasideda, bet nežinai, kur jis baigiasi...

pastato projektavimas

Completed projects

  • Project task: Passenger terminal renovation carried out in Palanga airport meeting the Schengen requirements.
  • Our work: Technical and working projects of engineering systems in the 3,553 m2 building. Ventilation, heating, water and sewage systems and a gas boiler station.
  • Achieved result: The project was carried out in 2008 by installing systems and condensing boilers that conserve resources and the environment, and produce more heat.

Contact us: (8 5) 213 38 17
info@balterma.lt